How is the amount of the connection fee determined for the connection of customers to the energy supply network of existing or future construction facilities?

The amount of the connection fee for connecting customers to the energy supply network of existing or building construction facilities is determined based on the following decisions of the Cabinet of Ministers of the Republic of Azerbaijan:

"For the energy supply network of existing or building construction facilities with the required power of household subscribers up to 20 kW (including 20 kW from the existing 0.4 kV network, 1 phase), Decision No. 327 of the Cabinet of Ministers of the Republic of Azerbaijan dated July 24, 2018 on the sums of the connection fee for connection within a period of 24 (twenty-four) days;

"For 20 (twenty) and 10 (ten) days for the connection of existing or building construction facilities to the power supply network of entrepreneurs with a required power of up to 150 kW (including 150 kW from the existing 0.4 kV network) Decision No. 180 of the Cabinet of Ministers of the Republic of Azerbaijan dated April 27, 2018 on the amounts of connection fees.