According to the Decree of the President of the Republic of Azerbaijan No. 1313 dated April 4, 2017 on “Simplification of the electricity supply procedures to existing or under construction facilities of entrepreneurs, the rules on “drafting and submitting technical conditions, project estimate documents, as well as connecting to the power supply network in order to supply of electricity to existing or under construction facilities of entrepreneurs with the required capacity up to 150 kW (from the existing 0.4 kW network including 150 kW network) was approved in order to increase the efficiency of business and investment environment of the country, to attract local and foreign investors, to  improve the position at the international ratings, to optimize the procedure and timing of connecting to the power supply networks, to implement services with better quality, convenience and innovation, to provide clarity and customer satisfaction in this field. 8 Technical Councils were established at “ASAN Utility” and “ASAN Service” Centers in order to control the related activities.  

Currently, the Technical Councils are functioning at “ASAN Utility” Centers 1 and 2 and at “ASAN Service” Centers in Sumgait and Ganja.

The works on connecting the facilities of the entrepreneurs to the power supply network were conducted by the Ministry of Energy at the Technical Councils functioning since May 15, 2017, while the Energy Regulatory Agency under the Ministry of Energy was empowered to deliver this function since May, 2018. 

According to the Decree of the President of the Republic of Azerbaijan No. 1313 dated April 4, 2017, in order to simplify the procedure of supply of electricity to existing or under construction facilities of entrepreneurs, single window procedures were decreased from 7 to 3, the time period for connecting to the power network was reduced from 69 days to 24.

According to the decree of the Cabinet of Ministers dated April 27, 2018, starting from May, the process of connecting the facilities of entrepreneurs to the power supply network has been conducted on the basis of determined amounts. According to the new decision, the fee for connecting to the power supply network of the facilities of entrepreneurs with the required capacity up to 150 kW (from the existing 0.4 kW network including 150 kW network) was approved. The fee for connecting to the power supply network varies according to the customer preferences to connect within 24 days or 12 days.

According to the amendments made by the Decree of the President of the Republic of Azerbaijan No.437 dated December 25, 2018, the period for connecting to the power supply for the facilities of the entrepreneurs with the required capacity up to 150 kW is 20 days. The implementation of the procedure was reduced from 3 stages to 2. It is enough to approach “Small and Medium Entrepreneur (SMEs) Houses”, “ASAN Utility” and “ASAN Service” Centers to connect the facilities of the entrepreneurs with the required capacity up to 150 kW to the power supply network regardless the district of location. If there is a transformer in the network balance at a distance of 400 meters, the connection will be provided within 20 days after the payment is made according to the single tariff. During this process, the interaction with the entrepreneurs occurs only while applying for the connection to the power supply network and providing power.

The entrepreneur should approach “SME Houses”, “ASAN Utility” and “ASAN Service” Centers in case of the facilities require connection to more than 150 kW or located in the area without a transformer at a distance of 400 meters. According to the Decree of the Cabinet of the Ministers No.234 dated August 27, 2013, the entrepreneur is provided with a technical condition within 10 days. The implementation of the technical condition is carried out by a power supply enterprise or specialized enterprise in accordance with a choice of the entrepreneur.

For more information on single tariffs and the required documents, please see the following links for each kW required.

Tariffs

Required documents

  1. Information on free power and connection possibilities

Connection of the facilities of the entrepreneurs to the power supply network has been simplified (Video)

News

Energy

Events

22.11.19 en

Services

 Media  Call Center  Hotline Commodity
 media  call1  hotline
 en  Brent $/b 62,34
 flag usa2x  WTI  $/b 56,92
 az  Azeri Light  $/b 66,91
Appeal Council Technical Council Announcements Southern Gas Corridor Informative Data
         
appel texnikiSmall annonceSmall sgcSmall maarif

 

 

1 2 3 4 fond

 

aggression khojaly abida1EN virtual qarabag maps en

 

 

socar logo ardnf1 azenerji azeriqaz azerisiq azeristilik asan
Saytda yerləşdirilən məlumatlar və saytın dizaynı. © Energetika Nazirliyi 2018. Bütün hüquqlar qorunub

Please publish modules in offcanvas position.