- Main page
- News
The heating boiler houses in Shusha are fully ready for the season
Minister of Energy Parviz Shahbazov paid a visit Shusha on October 28 to check the state of design, construction and installation of boiler houses, in-building heating and hot water supply systems in a number of facilities in Shusha. The Minister together with Aydin Karimov, special representative of the President of Azerbaijan in Shusha and other representatives reviewed the heating boiler houses of Azeristiliktechizat OJSC within the preparation for the winter of Shusha and got familiar with the work done.
It should be noted that the relevant heating boiler houses in Shusha are fully ready for winter.