"Regulation on the Issuance of Construction Permits and Permission for the Operation of Certain Construction Objects", 2019

Article 3.7. In accordance with subsection 3.5.2 of this Regulation, supply enterprises must ensure that the technical conditions related to engineering and communication provision are submitted electronically to the authority issuing the construction permit within 10 (ten) days from the date of receipt of the application.

https://e-qanun.az/framework/41111

"List and Classification of National Spatial Information" approved by Resolution No. 448 of the Cabinet of Ministers of the Republic of Azerbaijan dated November 15, 2019

Part 16. Engineering communication support system: Information on resources such as telecommunications, energy, natural gas, water, sewage, as well as utility lines and pipelines (including their production, transportation, distribution and consumption according to resource types).

https://e-qanun.az/framework/43631